Posts

Badly injured ankle that is going to keep me off my feet for a few weeks.

  Last weekend while working on my other project boat in my yard I badly injured my left ankle which as put me off any heavy physical work, however, it will not stop me from getting some work done of other projects that do not me to stand to do them.  Jobs like rubbing down the bits that were brought back from Chance over the past few months which are in my workshop.    I had made a lot of plans for the next few months which now have to be amended. The main job that is going to have to be amended is the removal broken ribs and the rotten planks that are going have to be replaced before we can move Chance back to Essex to be near my workshop. So I am going to have to get some help to do the job while I can not get in the boat to do the job myself.  So if anyone knows of anyone who can help in the Preston area please DM me. Thanks from Simon Tricia & Michael and my brother John

Update on progress on the restoration of Chance and more helpers in the way of my wife and son.

So far, my brother john and I have stripped out the inside of Chance so there is very little in the way of the hull, so now we can turn our attention to removing the broken ribs and replacing them with green oak which will be steamed in place using the old method of a wooden steam box and using an electric boiler to make the steam. However, before we can steam the new ribs in position we have to take off the both side deck edge covering boards on the fore deck and the aft deck on the starboard side so that the steamed ribs can be push down into position from above behind the single beam shelf in the aft cabin and behind the high deck beam shelf and the lower beam shelf which is the beam shelf that is the beam shelf in the aft cabin which is used to bolt the rubbing stake as it is steamed in position as it curves round the hull. So, while I am at my workshop it will be time to sort out the oak and next time, I am up at Chance I will cut the oak to the correct size and then steam it ...

Plans for next trip to Chance

So far, we have removed much of the interior furniture to gain access to the inside of the hull to inspect the condition of the planking and to inspect the condition of ribs throughout the boat. What we found was that the forward part of the boat, that is from the stem to as far back as the galley the ribs were in good condition and will only need washing down to come clean and then get a few coats of primer and then undercoat and finally either white or cream gloss to finish off the paint work in that part of the boat. However, that is where the good part ends because from then on it is a different story as many of the ribs in the main cabin are broken along the line of the turn of the bilge. Not all the ribs are broken, in this area there are 12 ribs aside, all but one on the starboard are broken, however, on the port side 8 out of 12 ribs are broken. So, there are going to be a lot of work that needs doing in this area alone to give back this part of the boat its original strength. ...

Making a start on some of the smaller repairs needed to the doors from Chance

Image
  Having cut out the broken piece of wood from this door frame it is time to let in a piece of Mahogany that is a close match to the existing colour of the original mahogany. This is the only damage on this door, so when it is planed down and sanded back and a little bit of stained varnish it will match the surrounding wood.   A least this is a start with more small and larger repairs to come has we go through the large number doors we have to do that came out of Chance. After the glue had cured over the weekend it was time to plane and sand the repair to the same level as the rest, the only thing to do now is stain the new piece to the same darker colour of the rest of the door frame. After a coat of dark mahogany stain and a few coats of yacht marine varnish it will be okay. One door repair down more to come over the next few weeks and months as we go through the pile of doors that need repairing or replacing.

Looking for missing parts for my restoration of Chance

When I was given Chance last year the previous owner had only just got the boat a few months before he gave Chance to me. The major problem was that the owner before him had many of the parts from the boat still in his possession and was unwilling to handover the parts he had taken off Chance to the owner who I was given Chance from.  So many of the parts are with the owner who gave Chance to before me. So now I have to source a large number of parts to replace the missing items such as , portholes of various sizes, a complete set of stanchions, 2 x tabernacles mast fittings  , chainplates and many other items which I will list later after I have gone over Chance to see what items are missing.  I am now at a stage in the restoration where I will just have to take a few more items out of the inside of the cockpit and then I will be making a start on the hull planking and the ribs. However, before I can tackle the ribs I will have to remove the deck edge covering boards to ...

Lack of Feedback, Comments would b helpful to know what I need to change with my contain on my patreon page?

  Dear readers of my Patreon page,  I know you read my page as it keep a record of the number of people who have read the page and to anyone else. So far it has been disheartening the lack of interaction I have had on my patreon page and my YouTube channel about my restoration project on Chance. If there is anything wrong with the contain or it is boring the hell out of you please let me know and I can change the contain or close the page down.  I have been a full time boatbuilder for the past 45 years and have a wealth  experience in the boat building and restoration industry which I would like to hand on to future generations , I am husband and a father of a disable adult which makes life interesting on a daily basis.  My son has help me from time to time on this project and my other project Mai Star II which you can follow on another Patreon page. My wife is helping to when her work shifts allow and I also have my brother helping with this project, so it is a...

The interior now in a position to start cleaning out the bilges and making plans for the next stage of the restoration.

Image
After what seems an age, finally we have got the interior woodwork and framework cleared out of interior of Chance. Now the major work can start in earnest. The forecabin now as all the framework of the berth and the chain locker bulkhead removed and just a pair of temporary floorboards in the place of the original floor boards that will go back in at a later date in the restoration The main cabin now a great empty space with just the floorboards down to cover over the bilges One of the jobs that has to be done when we next go to to Chance is to remove the original bilge pump pipe which goes along the middle of the bilge above the ballast and down into the centre bilge area That along with the original fresh water feed pipe which runs along the starboard engine bed to toward the galley area in the cabin space between the main cabin and the forecabin   Now that the last of the framework is out of the aft owners cabin, the outline of the original berth configuration can clearly ...

A major step forward in the cleaning out of the boat and making plans for the next trip to the boat.

Image
Now from the base of the stem to the aft bulkhead in the forecabin it is cleaned of the loose dirt and now needs a good washing down with degreaser and bio degradable soap to clean the last of the grease and dirty in the bilges and then give the bilges time to dry out for the first time in many years and then give the bilges it first fresh coat of bilge since the boat was built in 1948. Then on to the galley bilge and the forward end of the main cabin bilge Finally found the bottom of the bilge after removing all the dirt and mess out of the bilges  Muck every where but no brass, just more muck as we made our way along te main cabin bilge until we got to the engine bay bulkhead Working our way along the main cabin bilge, what did we find more ballast weights The only problem we have to cut out more old bilge pump pipework from when the boat was built as the weights are under the bilge pump pipe  now a great cavernous space is left so that we can work on the rib removal and ref...

The two halves of the aft cabin hull, the pile of wood that has come out of the boat over the weekend and the shape of the aft berth in the port side.

Image
The port side in the aft is has it was when Chance was built in 1948 with single ribs and no doubled or sistered ribs in sight The starboard side on the other hand is full of doubled and sistered ribs.So at sometime in the past there was a lot of work done to this side. There most have been a lot of broken ribs and rather than replace the broken ribs just added extra ribs. A short term job and one that is going to be corrected when the ribs are replaced with complete length ribs from the deck to keel. The main job will be to remove the deck covering or edging boards so that the ribs can be pushed down from the deck and steamed into position and held there while the copper nails are driven through the new ribs and roved into place. This is the pile of wood that has come out of the galley area port and starboard sides the cupboard unit on the starboard and settee to port and the base unit up against the engine bay bulkhead. Also the heads compartment and the last of the wood in the aft c...

Having fun dismantling the main cabin of all its woodwork and frames

Image
The settee back and its framework finally removed to expose the hull planking ribs and frames for inspection  The shelf above the settee back as also been removed as this was in a bad condition as well especially at the aft end where it was very rotten  The trucking in this photo is for the air take for the engine bay which for some reason unknown to me is blanked off at the top and the bottom end of it is missing the fan motor to pull air into the engine bay to keep the temperature down in the engine bay while the engines are running  One more broken rib and the last one in this area is still intact, however the top of the frame behind it is rotten at the top and will need replacing in the near future The air intake trucking now removed and thew aft end of the settee bunk front just about to be removed to clear the area up for further inspection  The underside of the athwartship settee bunk front showing the fan housing for the engine intake fan.