The sheer amount of varnishing we have done on the parts out of Chance and there is more to come over the coming months

 Here are just a few parts that have been varnished over the past few weeks with still a lot more to come in the coming weeks and months ahead

This first photo is of the port side galley doors which have to have a new framework making for them to sit in and the put back in place on the boat once the bulkheads are repaired and re-varnished.


The port side door for the portside lower galley unit.


The top strips for thew butterfly hatches for the rails to go in to stop people from putting their foot through the butterfly hatch glass and the top cover panels for the aft hatch and the wedges to keep the aft hatch open for ventilation. 



The upper part of the starboard galley unit which needs to be varnished and a little bit of repair work done to the ends.


The starboard main cabin wine locker door at the forward end of the starboard sideboard front which is being repaired over the next few weeks.


The port side lower galley unit front and one of the many drawers we have repaired and have varnished the front panel


The main cabin door, this will be refitted once the cockpit bulkheads are stripped and revarnished.


The starboard side galley unit front panel now varnished very likely to cover the two holes with a wooden vent cover to keep the locker airy and dry.


The bottom panel for the starboard side sideboard in the main cabin


The upper panel for the port side galley locker which is in need of a bit of TLC and then varnishing like the rest of the interior woodwork


The starboard side main cabin doors and the starboard side galley unit doors.


The two parts of the Baby Blake toilet which we are restoring. A new Baby Blake toilet is now costing £5500.00 so we are going to restore the one we have.


Another set of galley doors 


The two doors for the port side settee and the worktop for the port side galley unit


The two navigation light holders have been varnished on the other side and now are ready to be painted green and red before the navigation lights are refitted on these holder and then the holders mounted on the wheelhouse roof.


The butterfly hatches now ready have the new glass fitted in and then the quadrants made up and then finish off the varnishing of them later. 



The main top hatch into the main cabin from the cockpit 


The other two drawers we repaired and now been varnished.


Comments

Popular posts from this blog

Cleaning up the portside propeller Shaft & the propeller to find out the diameter and pitch & the manufacturer of the propeller

A big shout out for a cover to put over Chance so we can get on with the restoration of Chance.

Chance Autumn update