The chart table framework having work done on it to stabilize the framework before the top and drawers are refitted.
The chart table framework having some much needed repair work done to stabilize the framework so it can be refitted to the cockpit once the cockpit as been rebuild.
The upright rail in the photo was just one of the parts needed to stabilize the framework .
The other part needed was the corner brace to square up the framework back into its correct shape
The framework now able to stand up by itself for the first time in a long time since it was removed out of the cockpit. Once the glue as cured the other work to stabilize the unit will be done. reinforcing the side and top panels from splitting and the the whole unit will be sanded down and re-varnished ready to be refitted into the cockpit once the cockpit floor is refitted.
A good clean down and paint and varnish it will look as good as new and ready for another 70+ years.
Comments
Post a Comment