Its cold outside, so it is time to go indoors and get a number of smaller projects underway and ones that can be done in the workshop.

Its cold outside, so it is time to go indoors and get a number of smaller projects underway and ones that can be done in the workshop.
Two projects that spring to mind are the diesel cooker, the Baby Blake Toilet which both need a lot of work done to them to get them both back into working order.
Then they will be able to put back into Chance later on in the restoration project. The diesel cooker is a Dickinson Bristol cooker which as been neglected and the electrical parts have not survived the years of neglect and water damage. The parts will have to be removed from the cooker and recycled at my local recycling business. So not in land fill. Inside the firebox there is a small area of missing fire cement which can be easily sorted by making up some more fire cement and replacing the missing area and letting dry off. the other item that is missing in the firebox is the part that makes the diesel cooker work. I have been informed by Dickinson's the cooker manufacturers that as long as I fit the new parts the cooker will be back in working order and give many more years of service.
The Baby Blake Toilet is going to need stripping down to its individual items which will need to be cleaned and any of the parts which are worn out or otherwise not working will be replaced so that the toilet is back in working order and be able to be used once more.
Other jobs that can be done in the workshop are to get down off the shelves all the drawers which were removed from Chance while we removed all the interior furniture before Chance was transported back to Walton on the Naze from Woodplumpton. Some of the drawers are in a bad condition with only the drawer front being able to be used as the rest is either missing or rotten from being laid around in the boat and getting water damaged and not being stored so them could be kept dry. So over the next few months it is a matter of getting out the dovetail cutter and router and making up new drawers of different sizes and shapes to fit in different parts of the interior from which they were originally fitted.

Comments

Popular posts from this blog

A big shout out for a cover to put over Chance so we can get on with the restoration of Chance.

Chance Autumn update

Next Job at the stern of Chance is going to be to remove the Rudder on Chance