Hopefully tomorrow will be our last but one trip to Woodplumpton before Chance get put on to Transport and transported down to Essex

 Tomorrow and for the next three days we are going back to Chance were Chance is presently laid up in Woodplumpton to get her safe and ready to go on transport at the end of the month.

The main job will be to put the wood that when up to her last time in the boat, originally we were going to steam in some rib, however, thing got side tracked and that is not going to be the case. The wood is going to be put in the main cabin and the wheelhouse roof is going to be put in the cockpit so that it will not get damaged or lost on the trip down from Woodplumpton to Essex on the 1st of November. The masts will be put on the transport along with Chance, however, the booms will be able to come back with on the trailer on the set of high bars on the second trailer along with any of the parts that have not already been brought back to Essex before on previous trips. So part of this weeks trip is to going back a lot of the equipment that is in the boats interior and under her sides and make the yard look tidy ready for the lift and transporting back to Essex. So we are going to have our hands full and have a few long days ahead.

Comments

Popular posts from this blog

A big shout out for a cover to put over Chance so we can get on with the restoration of Chance.

Chance Autumn update

Next Job at the stern of Chance is going to be to remove the Rudder on Chance