Starting on the transom and finding out the major repairs needed to be done before any work can be done to the planking
The way I first saw Chance a year ago and a job I was not looking forward to doing
First job was to cut out the sections of the transom between the beams running athwartships and then remove the bit fixed to the beams
The first of the many odd repairs done to the transom. The transom covered up the end grain of the planks with a thin layer of plywood
The frames are well rotten and need replacing first before any work can start on any part of the boat
The upper part of the transom was made up of diagonal plywood, however, the bottom part was made up of athwartships layers of plywood
One bit if you can see it, is that the starboard side as dropped and the the sheer line shows that it as happened, so the starboard side is going to have to be propped up back into position until the sheer line back in the correct position
With the ribs out of the starboard side in the aft cabin and with careful propping the shape should come back in the starboard side and the transom will be the correct shape once more
Comments
Post a Comment