More of the jigsaw puzzle to sort out and repair as possible and remake if needed

This piece is the front of the hanging wardrobe in the main cabin has you come down the steps on the starboard hand side  


This is the forward bulkhead to the hanging wardrobe which is going to be replaced, the only restorable part is the front rail which is the forward part of the wardrobe front, which will need carefully removing off the bulkhead. 


More of the jigsaw puzzle to be sorted through over the next week to see what can be salvaged from the parts which were brought back from Chance at Woodplumpton  


The chart table and the drawer unit which needs a good clearing down and repairing as necessary and then varnishing and painting before it is put back in place once the wheelhouse is sorted and repaired as necessary 


Another pile of parts that need sorting out 




 

Comments

Popular posts from this blog

A big shout out for a cover to put over Chance so we can get on with the restoration of Chance.

Chance Autumn update

Next Job at the stern of Chance is going to be to remove the Rudder on Chance