Major works in the aft cabin with a lot of ribs that have to be removed and single ribs refitted and a complete make over of the area to put the strength back in this end
The starboard side in the aft cabin is a jumble of doubled and sistered ribs which need to be removed and single ribs refitted as is the case on the port side which appears to not had so much damage or work done to the ribs. So in order to sort this area out there is going to be a wholesale removal of the doubled and sistered ribs and complete ribs from the keel to the underside of the deck done in this area.
In the bottom left hand corner of the photo it can be seen where the plank as given way from the butt block.This plank will be removed to ensure that the joints are under frames and not fixed to butt blocks
The port side propeller shaft under the floor in the aft Heads, this is going to be renewed in time when the new engines are fitted and a more modern stern gear is fitted
Comments
Post a Comment