Planning for the next trip to Woodplumpton to start on the hull repairs

This is going to be our first place we are going to tackle, the aft cabin on the starboard side with the worse area of rib repairs that is needed to be renewed in the boat. The area where there are so many short or doubled or sistered ribs and the place where the shape of the hull is not the shape it should be. It is also the area where there are a number of planks need replacing in the underside of the hull.


As can be seen in this photo in the top left hand corner, there a number of planks that need renewing.. This will need the starboard  "A" bracket and the starboard propeller stern tube log removing to get rid of the rotten planks and get back to good planking.  Once the planking is renewed then the "A" Bracket and Stern tube log will be refitted and a new oak Stern Tube Log made to replace the old Stern Tube log. 

Once this area of the hull is sorted and re-ribbed , then we can move along the hull to the next area of the hull that need ribs and planking replacing . So this is what we will be doing over the next few months as we get the hull strong enough to be moved to Essex.


Comments

Popular posts from this blog

A year to remember and also forget.

Chance Autumn update

It is now 6 months since I become the owner of Chance.